| Production
of the whole group goes well in May, particularly,
the BF 6 continuously works with a high level
and a longer time circle, and the steel making
system works properly too, which are the main
factors for the production targets achieved
in May. The main figures of production from
May 1st to 29th of the group are as followings.
Items quantity (10 thousand tons)
Steel 13.9
Iron 18.5
Rolled steel 12.8
Sinter 31.9
Coke 8.1
It is estimated that the whole group will
meet the following production targets in May.
Items quantity (10 thousand tons)
Steel 15
Iron 19.3
Rolled steel 13.5
Sinter 34
Coke 8.6
Kungang Production Management Dept.
Director: Mr. Sun Xiaoyao Contact: Xue Heping
May, 30, 2001
|